Repair of the Mont Blanc tunnel: Efectis...
Fire safety is one of the major concerns with regard to repair work in the Mont Blanc Tunnel. The spalling…
Fire safety is one of the major concerns with regard to repair work in the Mont Blanc Tunnel. The spalling…
Last February Efectis Nederland performed a hose stream test according to IMO Resolution MSC.307(88), FTP Code 2010, at the request…
The tunnel rings are connected to each other by metal rings, and seismic joints are being used to avoid the…
Efectis has been invited to attend the “Third Conference on Urban Safety and Fire services” in Tehran (Iran) on February,…
The PREVENTICA 2018 exhibition took place in Casablanca from 27 to 29 April. Efectis was present with a stand, allowing…
In April and May, Efectis attended events in Istanbul and Kocaeli, some of them for the first time. Our main…